HMS Black Swan WIP Part 1 – Specs

Well here  is part one.

These are the specs supplied to me. On the far right is the number of squares each section uses. This follows the standard 1 ton=2 squares rule. (Each square of floor space is 1.5m wide – One ton = 14 cubic metres: the volume of one ton of liquid hydrogen. Two 1.5 metre squares from deck to ceiling, occupy approximately 1 ton)

Though I will break that rule, as I always assume some sections or taller or thinner than the 2.3m (3m with wiring etc) deck height. This is especially true of cargo sections.

In the’ MTU’ this ship is in, it has dual layer armour and does not apply the 1 ton for fire control for each bay.

HMS Black Swan 1000t Sloop Tons Price (Mcr.) S
Hull 1000 Tons Hull 22 100.00
Structure 22
Streamlined 10.00
Reinforced Structure (2 pts) 50 10.00 100
Armour Titanium Steel 6 points 150 15.00 300
Crystaliron 4 points 50 20.00 100
Jump Drive L Jump 3 60 110.00 120
Manoeuvre Drive L Thrust 3 21 44.00 42
Power Plant L Rating 3 34 88.00 68
Bridge Standard 20 5.00 40
Computer Model /5 Rating 25 10.00
Electronics Advanced DM+1 3 2.00 6
Counter Measures Suite 7 6.00 14
Weapons Hardpoint #1 Particle Beam Bay 50 20.00 100
Hardpoint #2 Fusion Gun Bay 50 8.00 100
Hardpoint #3 Fusion Gun Bay 50 8.00 100
Hardpoint #4 Torpedo Barbette 5 3.00 10
Hardpoint #5 Triple Turret (Sandcaster x3) 1 1.75 2
Hardpoint #6 Triple Turret (Sandcaster x3) 1 1.75 2
Hardpoint #7 Double Turret (Beam Laser x2) 1 2.50 2
Hardpoint #8 Double Turret (Beam Laser x2) 1 2.50 2
Hardpoint #9 Double Turret (Pulse Laser x2) 1 2.00 2
Hardpoint #10 Double Turret (Pulse Laser x2) 1 2.00 2
Ammunition Nuclear Torpedoes x4 10 20
Sandcaster Barrels x80 4 8
Fuel 344 Tons One Jump-3 and 4 Weeks of Operation 344 688
Cargo 0 Tons
13 Staterooms 52 104
Extras Fuel Scoops Integral
Fuel Processors x8 (160 Tons / Day) 8 0.40 16
Ship’s Locker
Armoury 2 0.50 4
Armoured Bulkheads (M-Drive,Particle beam bay, Fusion bays, Power plant & Bridge) 22.8 4.56 45.6
Software Manoeuvre/0 Rating 0
Jump Control/3 Rating 15 0.30
Fire Control/3 Rating 15 6.00
Library/0
Maintenance Cost (monthly) 0.040
Life Support Cost (monthly) 0.026
Total Tonnage & Cost 998.8 483.26
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s